వెలిగొండ ప్రాజెక్ట్ ట్రయల్‌ రన్‌ సక్సెస్‌ | Veligonda Project Trial Run Successful

1 min read

65 words

వెలిగొండ ప్రాజెక్ట్ ట్రయల్‌ రన్‌ సక్సెస్‌ | Veligonda Project Trial Run Successful
Spread the love

1 min read

65 words

0
(0)
వెలిగొండ ప్రాజెక్ట్ ట్రయల్‌ రన్‌ సక్సెస్‌ | Veligonda Project Trial Run Successful



The trial run for water release from the Veligonda Project has been successfully completed, with project gates opened at Kollam Vagu and Krishna water released into the tunnel system. Officials closely monitored the water flow, gate performance and the movement of water through the tunnels, while an alert was issued by sounding the siren at the Gantavanipalli Cross Head Regulator.
#VeligondaProject #Veligonda #KrishnaWater #VeligondaTunnels #ETVDigital

How useful was this content?

Click on a star to rate it!

Average rating 0 / 5. Vote count: 0

No votes so far! Be the first to rate this content.

We are sorry that this content was not useful for you!

Let us improve this content!

Tell us how we can improve this content?

error: Content is protected !!